{"id":4837,"date":"2020-04-03T12:32:25","date_gmt":"2020-04-03T03:32:25","guid":{"rendered":"https:\/\/cnic.jp\/english\/?p=4837"},"modified":"2020-04-03T12:32:28","modified_gmt":"2020-04-03T03:32:28","slug":"current-state-of-post-accident-operations-at-fukushima-daiichi-nuclear-power-station-sep-2019-to-jan-2020","status":"publish","type":"post","link":"https:\/\/cnic.jp\/english\/?p=4837","title":{"rendered":"Current State of Post-Accident Operations at Fukushima Daiichi Nuclear Power Station (Sep. 2019 to Jan. 2020)"},"content":{"rendered":"\n<p>By Matsukubo Hajime, CNIC<\/p>\n<p><strong>State of the Plant<\/strong><\/p>\n<p>The water temperature in the containment vessels and the spent fuel pools (SFPs) varies mostly around less than 32<sup>o<\/sup>C and no great changes have been seen. The state of releases of Xenon-135 (half-life roughly nine hours), released when uranium fuel undergoes fission is also unchanged and it can therefore be estimated that the state of the reactors is stable. Further, according to an assessment by TEPCO in December 2019, around 28,000 bequerels per hour (Bq\/h) of radioactive materials were being released from the buildings (Fig.1).<\/p>\n<p class=\"p1\"><span class=\"s1\"><i>Fig. 1. Releases of radioactivity from Units 1 to 4 of Fukushima Daiichi Nuclear Power Station (Bq\/h)<\/i><\/span><\/p>\n<p><a href=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/emission.jpg\" rel=\"attachment wp-att-4882\" data-rel=\"lightbox-image-0\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-large wp-image-4882\" src=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/emission-1024x526.jpg\" alt=\"\" width=\"1024\" height=\"526\" srcset=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/emission-1024x526.jpg 1024w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/emission-300x154.jpg 300w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/emission-768x395.jpg 768w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/emission.jpg 1088w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/p>\n<p>At the same time, decay heat has fallen greatly with the passage of time, and thus the volume of cooling water injected into the reactors has been reduced.\u00a0To consider the optimization of procedures in possible future emergencies and so on, following experimental reduction and cessation of injected volumes of cooling water into Unit 2 in April and May 2019, similar experiments were also conducted at Unit 1 in October and Unit 3 in February 2020. The temperature rose 1<sup>o<\/sup>C during the eight hours while injection of cooling water into Unit 2 was suspended, and a 0.5<sup>o<\/sup>C rise in temperature was seen in Unit 1 during the 49 hours while injection of cooling water was suspended. The state of removal of nuclear fuel from the SFPs is summarized in Table 1.<\/p>\n<p><a href=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/04\/Table-1-SFP-cleanup.png\" rel=\"attachment wp-att-4893\" data-rel=\"lightbox-image-1\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-4893\" src=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/04\/Table-1-SFP-cleanup.png\" alt=\"\" width=\"948\" height=\"511\" srcset=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/04\/Table-1-SFP-cleanup.png 948w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/04\/Table-1-SFP-cleanup-300x162.png 300w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/04\/Table-1-SFP-cleanup-768x414.png 768w\" sizes=\"auto, (max-width: 948px) 100vw, 948px\" \/><\/a><\/p>\n<p>Nuclear fuel removal from Unit 4 has been completed. While multiple problems have been experienced with the equipment (fuel handling equipment crane and fuel-handling machine) for removal of spent fuel from Unit 3, removal began on April 15, 2019. (It was originally set to begin around mid-FY2018.)<\/p>\n<p>Work to dismantle the upper section of the Units 1 and 2 exhaust stack, in which a fracture was discovered in a supporting pillar, began on August 1.\u00a0The plan is to dismantle the 120m exhaust stack by dividing it into 23 blocks, but the work, originally scheduled for completion during FY2019, has been delayed by equipment troubles and adverse weather conditions and is now scheduled to finish in early May 2020. Additionally, tasks such as the construction of a coastal barrier as a measure against a Kuril (Chishima) Trench tsunami (first half of FY2020) and the creation of a landfill using the megafloat used to store contaminated water in 2011-12\u00a0are also underway.<\/p>\n<p class=\"p1\"><span class=\"s1\"><i>Fig. 2: Change in Average Number of Workers (Actual Values) Per Day on Weekdays<\/i><\/span><a href=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/3c7d5c80d7fb1139d9ed97d7f53396c9.png\" rel=\"attachment wp-att-4883\" data-rel=\"lightbox-image-2\" data-rl_title=\"\" data-rl_caption=\"\" title=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-4883\" src=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/3c7d5c80d7fb1139d9ed97d7f53396c9.png\" alt=\"\" width=\"846\" height=\"410\" srcset=\"https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/3c7d5c80d7fb1139d9ed97d7f53396c9.png 846w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/3c7d5c80d7fb1139d9ed97d7f53396c9-300x145.png 300w, https:\/\/cnic.jp\/english\/wordpress\/wp-content\/uploads\/2020\/03\/3c7d5c80d7fb1139d9ed97d7f53396c9-768x372.png 768w\" sizes=\"auto, (max-width: 846px) 100vw, 846px\" \/><\/a><\/p>\n<p>Changes in the number of workers per day are shown in Fig. 2.\u00a0As of December 2019, the number was 4,070, roughly half what it was at the peak of 7,450 as of March 2015. At the same time, problems originating in work mistakes are becoming more frequent at the site. TEPCO has stated that it reduced the number of workers at the site because tasks associated with contaminated water had stabilized and that the number of TEPCO staff had remained unchanged at 1,400 persons. The Nuclear Regulation Authority (NRA), however, voiced concerns, causing TEPCO to announce in October a reorganization that included the reassignment to Fukushima Daiichi Nuclear Power Station (FDNPS) of 120 staff that had been assigned to work at TEPCO\u2019s head office until that time. However, this was simply a paper reassignment, and since the number of staff at FDNPS has not actually increased, it is uncertain whether this will lead to fundamental improvements or not.<\/p>\n<p><strong>State of Contaminated Water<\/strong><\/p>\n<p>Contaminated water countermeasures at FDNPS can be broadly divided into three areas: 1) Reduction of groundwater flowing into buildings, 2) Reduction of contaminated water flowing into the sea, and 3) Reduction of the toxicity of contaminated water. Regarding the reduction of water volumes flowing into buildings, the main countermeasures are, from higher elevations downward, A) Pumping up groundwater at the groundwater bypass and releasing it into the sea (526,416m<sup>3<\/sup>\u00a0up to January 28, 2020), B) Installation of a frozen earth barrier (on-land water barrier, total length roughly 1,500m) surrounding FDNPS Units 1-4. (Ground temperature has now reached below 0<sup>o<\/sup>C except for one section. In January, around 20m<sup>3<\/sup> of freezing-point depressant (30% calcium chloride solution) leaked from a joint on a freezing pipe.) C) Pumping up water at the subdrains and releasing it into the sea (845,812m<sup>3<\/sup> up to January 28, 2020), and D) Paving of the site with asphalt to suppress permeation of rainwater into the soil.\u00a0Regarding reduction of contaminated water flowing into the sea, the countermeasures being taken include A) Groundwater leakage prevention by a steel water barrier on the sea side, B) Pumping up of groundwater dammed up behind the sea-side water barrier from the well points and groundwater drains (roughly 227,512m<sup>3<\/sup>\u00a0up to January 28; as this groundwater is highly contaminated, it is being transferred to the turbine building), and other measures.\u00a0<\/p>\n<p>Regarding the reduction of the toxicity of contaminated water, after removal of cesium and strontium and removal of impurities using reverse osmosis (RO), radionuclides other than tritium are removed by the multi-radionuclide removal equipment (ALPS \u2013 Advanced Liquid Processing System) and then stored in tanks (containing 1,184,858m<sup>3<\/sup>\u00a0as of January 23. However, due to past equipment malfunctions and operational policies, in many cases radionuclides other than tritium are present, resulting in only around 28% of the stored water being below the notification concentration). Besides this, water remaining in buildings is roughly 24,790m<sup>3<\/sup>, strontium-treated water, etc. is 70,848m<sup>3<\/sup>, water treated by RO is 9,911m<sup>3<\/sup>, concentrated brine is 500m<sup>3<\/sup>, concentrated wastewater is 9,245m<sup>3<\/sup>, etc.<\/p>\n<p>Furthermore, on February 10, the Subcommittee on the Handling of Water Processed by ALPS, etc. considering options for disposal of post-ALPS treated contaminated water announced a final report which stated, \u201cThere are many issues \u2026 relating to injection into geological formations, hydrogen desorption, and underground burial. Technologically speaking, the realistic options are the proven ones of vapor emission and ocean release.\u201d In the near future, the Ministry of Economy, Trade and Industry will hold consultations with stakeholders based on this report, but the overwhelming opposition to ocean release expressed at the public hearing in August 2019 is unchanged, and fisheries-related opposition is, as ever, strong. TEPCO has said that the onsite tanks will reach capacity, including the increase in the treated water in the near future, in the summer of 2022. Considering the NRA\u2019s permission for construction and construction work for the dilution and release facility, among others, it will be necessary to obtain the consent of stakeholders at the latest by the end of FY2020, signifying that this will continue to be a very difficult timetable to work to.<\/p>\n<p>The final report states, \u201cIn addition to the recommendations in this report, we trust that the government will decide on its policy with responsibility and determination while listening carefully to the views of a wide range of stakeholders, including local municipalities and producers of agricultural, forestry and fisheries products,\u201d and \u201cshould exercise decision-making through a transparent process.\u201d Thus far, the government, TEPCO, international organizations and others have repeatedly explained that there will be no harm from ocean release of (treated) contaminated water, but it is clear that this has not received the understanding of the Japanese people and neighboring countries, and it is hard to believe that this situation will change over the next year or so. Sticking obstinately to the current plan is nothing more than forcing the self-convenience of the schedule onto stakeholders whose consent they are unable to obtain. Further options, such as long-term storage, should be considered.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Matsukubo Hajime, CNIC State of the Plant The water temperature in the containment vessels and the spent fuel pools (SFPs) varies mostly around less than 32oC and no great changes have been seen.&#46;&#46;&#46;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[16,24],"tags":[],"class_list":["post-4837","post","type-post","status-publish","format-standard","hentry","category-accident","category-fukushima"],"acf":[],"_links":{"self":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts\/4837","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4837"}],"version-history":[{"count":7,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts\/4837\/revisions"}],"predecessor-version":[{"id":4894,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts\/4837\/revisions\/4894"}],"wp:attachment":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4837"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4837"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4837"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}