{"id":527,"date":"2004-09-04T17:16:32","date_gmt":"2004-09-04T08:16:32","guid":{"rendered":"http:\/\/www.cnic.jp\/english\/wordpress\/?p=527"},"modified":"2015-02-27T18:04:23","modified_gmt":"2015-02-27T09:04:23","slug":"significant-incidents-at-japanese-nuclear-power-plants-and-nuclear-fuel-facilities-jan-2003-dec-2003","status":"publish","type":"post","link":"https:\/\/cnic.jp\/english\/?p=527","title":{"rendered":"Significant incidents at Japanese nuclear power plants and nuclear fuel facilities  (Jan. 2003 &#8211; Dec. 2003)"},"content":{"rendered":"<table style=\"width: 95%;\" border=\"0\" cellspacing=\"2\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td>\n<table style=\"width: 837px;\" border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td width=\"63\" height=\"32\"><b><i>DATE<\/i><\/b><\/td>\n<td width=\"85\"><b><i>Operator<\/i><\/b><\/td>\n<td width=\"105\"><b><i>Facility Name<\/i><\/b><\/td>\n<td width=\"99\"><b><i>Type<\/i><\/b><\/td>\n<td width=\"485\"><b><i>Short Description of Incidents<\/i><\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">Feb. 7<\/td>\n<td width=\"85\">JNFL (Japan Nuclear Fuel Limited)<\/td>\n<td width=\"105\">Rokkasho Reprocessing Plant<\/td>\n<td width=\"99\">Reprocessing Plant<\/td>\n<td width=\"485\">Leak detected at fuel assembly transfer pit<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">Feb. 12<\/td>\n<td width=\"85\">Kansai-EPCO<\/td>\n<td width=\"105\">Takahama-1<\/td>\n<td width=\"99\">Pressurized Water Reactor (PWR)<\/td>\n<td width=\"485\">During periodic inpection crack found at neutron flux monitor nozzle (made of Inconel 600) mounted to reactor vessel bottom<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Feb. 18<\/td>\n<td width=\"85\">Shikoku-EPCO<\/td>\n<td width=\"105\">Ikata-1<\/td>\n<td width=\"99\">PWR<\/td>\n<td width=\"485\">Leak detected at chemical volume control tank outlet piping<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"64\">Feb. 27<\/td>\n<td width=\"85\">JAPC (Japan Atomic Power Company)<\/td>\n<td width=\"105\">Tsuruga-1<\/td>\n<td width=\"99\">Boiling Water Reactor (BWR)<\/td>\n<td width=\"485\">Reactor manually shut down due to leak detected at mechanical seals of\u00a0recirculation pumps (B and C)<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Feb. 27<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during planned stoppage<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Feb. 28<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima I-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Control rod interlock cancelation found at &#8216;one control rod draw check&#8217; during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>March 4<\/b><\/td>\n<td width=\"85\"><b>Tokyo-EPCO<\/b><\/td>\n<td width=\"105\"><b>Fukushima I-3<\/b><\/td>\n<td width=\"99\"><b>BWR<\/b><\/td>\n<td width=\"485\"><b>A control rod insertion delayed at &#8216;control rod insertion\/draw examination&#8217; during periodic inspection<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>March 5<\/b><\/td>\n<td width=\"85\"><b>Tokyo-EPCO<\/b><\/td>\n<td width=\"105\"><b>Fukushima II-1<\/b><\/td>\n<td width=\"99\"><b>BWR<\/b><\/td>\n<td width=\"485\"><b>Foreign metal material found at the top of a nuclear fuel assembly during periodic inspection<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">March 10<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of core shroud (made of SUS316L) middle and lower region during periodic inspection; cracks found at inside surface of H4 position, at outside surface of H6a position, at inside surface of H7 position, etc.<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">March 27<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-4<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at 6 welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">April 16<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at a weld between reactor pressure vessel nozzle safe-end pipe (made of SUS316L) and primary loop recirculation system piping (made of SUS304L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">April 17<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">April 17<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-4<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">April 29<\/td>\n<td width=\"85\">Chugoku-EPCO<\/td>\n<td width=\"105\">Shimane-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of core shroud (made of SUS316L) middle region during periodic inspection; cracks found at inside surface of H4 position<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"16\">May 8<\/td>\n<td width=\"85\">Kansai-EPCO<\/td>\n<td width=\"105\">Mihama-2<\/td>\n<td width=\"99\">PWR<\/td>\n<td width=\"485\">Generator power reduced due to leak at 5th high pressure feed water heater<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">May 12<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-5<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>May 15<\/b><\/td>\n<td width=\"85\"><b>Kyushu-EPCO<\/b><\/td>\n<td width=\"105\"><b>Sendai-1<\/b><\/td>\n<td width=\"99\"><b>PWR<\/b><\/td>\n<td width=\"485\"><b>Damage to 15 steam generator tubes during periodic inspection<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">May 20<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-5<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of core shroud (made of SUS316L) middle region during periodic inspection; cracks found at inside surface of H4 position and of V14 position<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">May 21<\/td>\n<td width=\"85\">Kansai-EPCO<\/td>\n<td width=\"105\">Mihama-3<\/td>\n<td width=\"99\">PWR<\/td>\n<td width=\"485\">Cracks found at reactor vessel bottom mounted conduit tube during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>May 22<\/b><\/td>\n<td width=\"85\"><b>Kansai-EPCO<\/b><\/td>\n<td width=\"105\"><b>Takahama-4<\/b><\/td>\n<td width=\"99\"><b>PWR<\/b><\/td>\n<td width=\"485\"><b>Damage to 2 steam generator tubes during periodic inspection<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">May 26<\/td>\n<td width=\"85\">Tohoku-EPCO<\/td>\n<td width=\"105\">Onagawa-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Reactor automatically shutdown due to &#8216;large ground acceleration&#8217; signal set off by an earthquake (magnitude 7.0)<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">May 28<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at guide roller installed area of a control rod handle during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">June 9<\/td>\n<td width=\"85\">Tohoku-EPCO<\/td>\n<td width=\"105\">Onagawa-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of core shroud (made of SUS316L) middle region and lower region during periodic inspection; cracks found at outside surface of H3 position and at inside surface of H7a position<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">June 10<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at a weld of core shroud (made of SUS304) lower region during periodic inspection; cracks found at inside surface of H7b position<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">June 14<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-3<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Fuel assemblies installation operation stopped due to lack of a control rod at a fuel cell during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">June 16<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at upper region of a weld of the core shroud (made of SUS304) during periodic inspection; crack found near upper lattice plate base<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">June 23<\/td>\n<td width=\"85\">Tohoku-EPCO<\/td>\n<td width=\"105\">Onagawa-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at a weld of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"16\">June 24<\/td>\n<td width=\"85\">JAPC<\/td>\n<td width=\"105\">Tsuruga-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at surface of control rod blades during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"80\">July 4<\/td>\n<td width=\"85\">JNC (Japan Nuclear Cycle Development Institute)<\/td>\n<td width=\"105\">Fugen<\/td>\n<td width=\"99\">Advanced Thermal Reactor<\/td>\n<td width=\"485\">Fire alarm set off at waste treatment building; window of low-level radioactive waste incinerator broken due to explosion and 460 million bequerels of radioactive ash leaked<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>July 8<\/b><\/td>\n<td width=\"85\"><b>JNC<\/b><\/td>\n<td width=\"105\"><b>Joyo<\/b><\/td>\n<td width=\"99\"><b>Experimental Fast Reactor<\/b><\/td>\n<td width=\"485\"><b>Reactor automatically shut down due to &#8216;neutron flux high&#8217; signal<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">July 15<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">July 24<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima I-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Leak found at instrumentation outlet of residue heat removal system during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">July 29<\/td>\n<td width=\"85\">Hokuriku-EPCO<\/td>\n<td width=\"105\">Shika-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L)during periodic inspection (also on Aug. 26 and on Sep. 3)<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">July 31<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of core shroud (made of SUS316L) middle region during periodic inspaction; cracks found at outside surface of H4 position<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Aug. 1<\/td>\n<td width=\"85\">Tohoku-EPCO<\/td>\n<td width=\"105\">Onagawa-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of primary loop recirculation system piping (made of SUS316L)during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>Sep. 7<\/b><\/td>\n<td width=\"85\"><b>Hokkaido-EPCO<\/b><\/td>\n<td width=\"105\"><b>Tomari-2<\/b><\/td>\n<td width=\"99\"><b>PWR<\/b><\/td>\n<td width=\"485\"><b>Leak found at regenerated heat exchanger; reactor manually shut down for inspection on Sep. 11<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\"><b>Sep. 10<\/b><\/td>\n<td width=\"85\"><b>JAPC<\/b><\/td>\n<td width=\"105\"><b>Tsuruga-2<\/b><\/td>\n<td width=\"99\"><b>PWR<\/b><\/td>\n<td width=\"485\"><b>Build up of boric acid powder and cracks found at welds of pressurizer relief valve nozzle and of pressurizer safety valve nozzle during periodic inspection<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">Oct. 6<\/td>\n<td width=\"85\">Tohoku-EPCO<\/td>\n<td width=\"105\">Onagawa-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Leak detected at containment vessel sump; damage found at mechanical seals of recirculation inlet pump and of recirculation outlet pump during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 6<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-4<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at guide roller installed area of control rod handles and at surface of control rod blades during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 7<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-7<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at impellers of reactor internal pumps during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">Oct. 9 &#8211; Nov. 7<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima I-1,2,3,4,6<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Various foreign materials (scaffolding members, clamps, vinyl sheet chips, vinyl tape chips, ropes, spanner, pen, etc.) found in suppression chambers during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 14<\/td>\n<td width=\"85\">Chugoku-EPCO<\/td>\n<td width=\"105\">Shimane-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Spacers slippage found at fuel assemblies during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"48\">Oct. 14 &#8211; Nov. 7<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-1,2,3,5,7<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Various foreign materials (vinyl sheet chips, ropes, electromoved grinder, pliers, dust mask, video tape, boot, heat insulating materials, etc.) found in suppression chambers during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 16 &#8211; Nov. 7<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-1,2,3,4<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Various foreign materials (vinyl sheet chips, vinyl tape chips, ropes, spanner, pen, etc.) found in suppression chambers during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 17<\/td>\n<td width=\"85\">Shikoku-EPCO<\/td>\n<td width=\"105\">Ikata-3<\/td>\n<td width=\"99\">PWR<\/td>\n<td width=\"485\">Emergency diesel generator activation failed at start-up operation<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 22<\/td>\n<td width=\"85\">Kansai-EPCO<\/td>\n<td width=\"105\">Takahama-2<\/td>\n<td width=\"99\">PWR<\/td>\n<td width=\"485\">Reactor manually shut down due to steam leak from 3rd low-pressure turbine inlet flange during conditioning operation<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Oct. 22<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima II-4<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Crack found at weld of primary loop recirculation system piping (made of SUS316L) during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Nov. 5<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Kashiwazaki-Kariwa-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">One part of cleaning device fell into reactor vessel during core shroud cleaning test operation during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Nov. 6<\/td>\n<td width=\"85\">Tohoku-EPCO<\/td>\n<td width=\"105\">Onagawa-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Various foreign materials (wire, vinyl sheet chips, vinyl tape chips, ropes, miniature lamp, etc.) found in suppression chambers during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>Nov. 9<\/b><\/td>\n<td width=\"85\"><b>Kansai-EPCO<\/b><\/td>\n<td width=\"105\"><b>Mihama-2<\/b><\/td>\n<td width=\"99\"><b>PWR<\/b><\/td>\n<td width=\"485\"><b>Reactor manually shut down due to primary coolant leak found at cap of bent line attached to pressurizer spray piping<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Nov. 18<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima I-6<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">One part of cleaning device fell into reactor vessel during control rod drive mechanism housing tub tube cleaning operation during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Nov. 19<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-2<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">SCRAM signal set off accidentally due to ocsillation in value indicated by average power range monitor<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Nov. 22<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">One part of cleaning device fell into reactor vessel during core shroud support cylinder cleaning operation during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Nov. 25<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of core shroud support cylinder and of core shroud support legs during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Dec. 2<\/td>\n<td width=\"85\">Chugoku-EPCO<\/td>\n<td width=\"105\">Shimane-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">A worker exposed due to inhalation of 917 bequerels of cobalt-60 during containment vessel head installation operation<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Dec. 5<\/td>\n<td width=\"85\">Kansai-EPCO<\/td>\n<td width=\"105\">Ohi-1<\/td>\n<td width=\"99\">PWR<\/td>\n<td width=\"485\">Reactor manually shut down due to leak from mechanical seal of primary coolant pump<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\"><b>Dec. 5<\/b><\/td>\n<td width=\"85\"><b>Tokyo-EPCO<\/b><\/td>\n<td width=\"105\"><b>Fukushima I-6<\/b><\/td>\n<td width=\"99\"><b>BWR<\/b><\/td>\n<td width=\"485\"><b>Leak found at water level gauge tube opening during periodic inspection<\/b><\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"16\">Dec. 18<\/td>\n<td width=\"85\">Chubu-EPCO<\/td>\n<td width=\"105\">Hamaoka-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Cracks found at welds of jet pumps during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"16\">Dec. 19<\/td>\n<td width=\"85\">JAPC<\/td>\n<td width=\"105\">Tsuruga-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Reactor automatically shut down due to lightning<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Dec. 20<\/td>\n<td width=\"85\">Tokyo-EPCO<\/td>\n<td width=\"105\">Fukushima I-6<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Stress reduction device stopped during operation to\u00a0reduce stress on control rod drive mechanism housing stub tubes during periodic inspection<\/td>\n<\/tr>\n<tr>\n<td width=\"63\" height=\"32\">Dec. 26<\/td>\n<td width=\"85\">JAPC<\/td>\n<td width=\"105\">Tsuruga-1<\/td>\n<td width=\"99\">BWR<\/td>\n<td width=\"485\">Leak detected at mechanical seal of\u00a0recirculation pump; reactor manually shut down on Dec. 28<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/td>\n<td><\/td>\n<\/tr>\n<tr>\n<td height=\"18\"><\/td>\n<td height=\"18\"><\/td>\n<td height=\"18\"><\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">\u00a0<b>*Please note:<\/b>\u00a0The entries in bold type indicate either (1) that the incident was a reportable incident under<br \/>\nThe Regulation of Nuclear Reactors and Related Matters Act, or (2) that CNIC judged it to be an especially significant incident.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"<p>DATE Operator Facility Name Type Short Description of Incidents Feb. 7 JNFL (Japan Nuclear Fuel Limited) Rokkasho Reprocessing Plant Reprocessing Plant Leak detected at fuel assembly transfer pit Feb. 12 Kansai-EPCO Takahama-1 Pressurized Water&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[17,4],"tags":[],"class_list":["post-527","post","type-post","status-publish","format-standard","hentry","category-accidentlist","category-data"],"acf":[],"_links":{"self":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts\/527","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=527"}],"version-history":[{"count":1,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts\/527\/revisions"}],"predecessor-version":[{"id":2289,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=\/wp\/v2\/posts\/527\/revisions\/2289"}],"wp:attachment":[{"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=527"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=527"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cnic.jp\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=527"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}