Significant incidents at Japanese nuclear power plants and nuclear fuel facilities

(Jan. 2003 - Dec. 2003)
DATE Operator Facility Name Type Short Description of Incidents
Feb. 7 JNFL (Japan Nuclear Fuel Limited) Rokkasho Reprocessing Plant Reprocessing Plant Leak detected at fuel assembly transfer pit
Feb. 12 Kansai-EPCO Takahama-1 Pressurized Water Reactor (PWR) During periodic inpection crack found at neutron flux monitor nozzle (made of Inconel 600) mounted to reactor vessel bottom
Feb. 18 Shikoku-EPCO Ikata-1 PWR Leak detected at chemical volume control tank outlet piping
Feb. 27 JAPC (Japan Atomic Power Company) Tsuruga-1 Boiling Water Reactor (BWR) Reactor manually shut down due to leak detected at mechanical seals of recirculation pumps (B and C)
Feb. 27 Tokyo-EPCO Kashiwazaki-Kariwa-3 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during planned stoppage
Feb. 28 Tokyo-EPCO Fukushima I-3 BWR Control rod interlock cancelation found at 'one control rod draw check' during periodic inspection
March 4 Tokyo-EPCO Fukushima I-3 BWR A control rod insertion delayed at 'control rod insertion/draw examination' during periodic inspection
March 5 Tokyo-EPCO Fukushima II-1 BWR Foreign metal material found at the top of a nuclear fuel assembly during periodic inspection
March 10 Chubu-EPCO Hamaoka-3 BWR Cracks found at welds of core shroud (made of SUS316L) middle and lower region during periodic inspection; cracks found at inside surface of H4 position, at outside surface of H6a position, at inside surface of H7 position, etc.
March 27 Tokyo-EPCO Kashiwazaki-Kariwa-4 BWR Cracks found at 6 welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection
April 16 Tokyo-EPCO Fukushima II-1 BWR Cracks found at a weld between reactor pressure vessel nozzle safe-end pipe (made of SUS316L) and primary loop recirculation system piping (made of SUS304L) during periodic inspection
April 17 Chubu-EPCO Hamaoka-3 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection
April 17 Chubu-EPCO Hamaoka-4 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection
April 29 Chugoku-EPCO Shimane-2 BWR Cracks found at welds of core shroud (made of SUS316L) middle region during periodic inspection; cracks found at inside surface of H4 position
May 8 Kansai-EPCO Mihama-2 PWR Generator power reduced due to leak at 5th high pressure feed water heater
May 12 Tokyo-EPCO Kashiwazaki-Kariwa-5 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection
May 15 Kyushu-EPCO Sendai-1 PWR Damage to 15 steam generator tubes during periodic inspection
May 20 Tokyo-EPCO Kashiwazaki-Kariwa-5 BWR Cracks found at welds of core shroud (made of SUS316L) middle region during periodic inspection; cracks found at inside surface of H4 position and of V14 position
May 21 Kansai-EPCO Mihama-3 PWR Cracks found at reactor vessel bottom mounted conduit tube during periodic inspection
May 22 Kansai-EPCO Takahama-4 PWR Damage to 2 steam generator tubes during periodic inspection
May 26 Tohoku-EPCO Onagawa-3 BWR Reactor automatically shutdown due to 'large ground acceleration' signal set off by an earthquake (magnitude 7.0)
May 28 Tokyo-EPCO Fukushima II-3 BWR Cracks found at guide roller installed area of a control rod handle during periodic inspection
June 9 Tohoku-EPCO Onagawa-2 BWR Cracks found at welds of core shroud (made of SUS316L) middle region and lower region during periodic inspection; cracks found at outside surface of H3 position and at inside surface of H7a position
June 10 Chubu-EPCO Hamaoka-1 BWR Cracks found at a weld of core shroud (made of SUS304) lower region during periodic inspection; cracks found at inside surface of H7b position
June 14 Tokyo-EPCO Fukushima II-3 BWR Fuel assemblies installation operation stopped due to lack of a control rod at a fuel cell during periodic inspection
June 16 Chubu-EPCO Hamaoka-1 BWR Cracks found at upper region of a weld of the core shroud (made of SUS304) during periodic inspection; crack found near upper lattice plate base
June 23 Tohoku-EPCO Onagawa-2 BWR Cracks found at a weld of primary loop recirculation system piping (made of SUS316L) during periodic inspection
June 24 JAPC Tsuruga-1 BWR Cracks found at surface of control rod blades during periodic inspection
July 4 JNC (Japan Nuclear Cycle Development Institute) Fugen Advanced Thermal Reactor Fire alarm set off at waste treatment building; window of low-level radioactive waste incinerator broken due to explosion and 460 million bequerels of radioactive ash leaked
July 8 JNC Joyo Experimental Fast Reactor Reactor automatically shut down due to 'neutron flux high' signal
July 15 Tokyo-EPCO Fukushima II-2 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection
July 24 Tokyo-EPCO Fukushima I-2 BWR Leak found at instrumentation outlet of residue heat removal system during periodic inspection
July 29 Hokuriku-EPCO Shika-1 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection (also on Aug. 26 and on Sep. 3)
July 31 Tokyo-EPCO Fukushima II-2 BWR Cracks found at welds of core shroud (made of SUS316L) middle region during periodic inspaction; cracks found at outside surface of H4 position
Aug. 1 Tohoku-EPCO Onagawa-2 BWR Cracks found at welds of primary loop recirculation system piping (made of SUS316L) during periodic inspection
Sep. 7 Hokkaido-EPCO Tomari-2 PWR Leak found at regenerated heat exchanger; reactor manually shut down for inspection on Sep. 11
Sep. 10 JAPC Tsuruga-2 PWR Build up of boric acid powder and cracks found at welds of pressurizer relief valve nozzle and of pressurizer safety valve nozzle during periodic inspection
Oct. 6 Tohoku-EPCO Onagawa-2 BWR Leak detected at containment vessel sump; damage found at mechanical seals of recirculation inlet pump and of recirculation outlet pump during periodic inspection
Oct. 6 Tokyo-EPCO Fukushima II-4 BWR Cracks found at guide roller installed area of control rod handles and at surface of control rod blades during periodic inspection
Oct. 7 Tokyo-EPCO Kashiwazaki-Kariwa-7 BWR Cracks found at impellers of reactor internal pumps during periodic inspection
Oct. 9 - Nov. 7 Tokyo-EPCO Fukushima I-1,2,3,4,6 BWR Various foreign materials (scaffolding members, clamps, vinyl sheet chips, vinyl tape chips, ropes, spanner, pen, etc.) found in suppression chambers during periodic inspection
Oct. 14 Chugoku-EPCO Shimane-1 BWR Spacers slippage found at fuel assemblies during periodic inspection
Oct. 14 - Nov. 7 Tokyo-EPCO Kashiwazaki-Kariwa-1,2,3,5,7 BWR Various foreign materials (vinyl sheet chips, ropes, electromoved grinder, pliers, dust mask, video tape, boot, heat insulating materials, etc.) found in suppression chambers during periodic inspection
Oct. 16 - Nov. 7 Tokyo-EPCO Fukushima II-1,2,3,4 BWR Various foreign materials (vinyl sheet chips, vinyl tape chips, ropes, spanner, pen, etc.) found in suppression chambers during periodic inspection
Oct. 17 Shikoku-EPCO Ikata-3 PWR Emergency diesel generator activation failed at start-up operation
Oct. 22 Kansai-EPCO Takahama-2 PWR Reactor manually shut down due to steam leak from 3rd low-pressure turbine inlet flange during conditioning operation
Oct. 22 Tokyo-EPCO Fukushima II-4 BWR Crack found at weld of primary loop recirculation system piping (made of SUS316L) during periodic inspection
Nov. 5 Tokyo-EPCO Kashiwazaki-Kariwa-2 BWR One part of cleaning device fell into reactor vessel during core shroud cleaning test operation during periodic inspection
Nov. 6 Tohoku-EPCO Onagawa-2 BWR Various foreign materials (wire, vinyl sheet chips, vinyl tape chips, ropes, miniature lamp, etc.) found in suppression chambers during periodic inspection
Nov. 9 Kansai-EPCO Mihama-2 PWR Reactor manually shut down due to primary coolant leak found at cap of bent line attached to pressurizer spray piping
Nov. 18 Tokyo-EPCO Fukushima I-6 BWR One part of cleaning device fell into reactor vessel during control rod drive mechanism housing tub tube cleaning operation during periodic inspection
Nov. 19 Chubu-EPCO Hamaoka-2 BWR SCRAM signal set off accidentally due to ocsillation in value indicated by average power range monitor
Nov. 22 Chubu-EPCO Hamaoka-1 BWR One part of cleaning device fell into reactor vessel during core shroud support cylinder cleaning operation during periodic inspection
Nov. 25 Chubu-EPCO Hamaoka-1 BWR Cracks found at welds of core shroud support cylinder and of core shroud support legs during periodic inspection
Dec. 2 Chugoku-EPCO Shimane-1 BWR A worker exposed due to inhalation of 917 bequerels of cobalt-60 during containment vessel head installation operation
Dec. 5 Kansai-EPCO Ohi-1 PWR Reactor manually shut down due to leak from mechanical seal of primary coolant pump
Dec. 5 Tokyo-EPCO Fukushima I-6 BWR Leak found at water level gauge tube opening during periodic inspection
Dec. 18 Chubu-EPCO Hamaoka-1 BWR Cracks found at welds of jet pumps during periodic inspection
Dec. 19 JAPC Tsuruga-1 BWR Reactor automatically shut down due to lightning
Dec. 20 Tokyo-EPCO Fukushima I-6 BWR Stress reduction device stopped during operation to reduce stress on control rod drive mechanism housing stub tubes during periodic inspection
Dec. 26 JAPC Tsuruga-1 BWR Leak detected at mechanical seal of recirculation pump; reactor manually shut down on Dec. 28
*Please note: The entries in bold type indicate either (1) that the incident was a reportable incident under
The Regulation of Nuclear Reactors and Related Matters Act, or (2) that CNIC judged it to be an especially significant incident.

Return to CNIC's Data page

Return to NIT 101 contents



CNIC

CNIC
Citizens' Nuclear Information Center
Akebonobashi Co-op 2F-B, 8-5 Sumiyoshi-cho,
Shinjuku-ku, Tokyo, 162-0065, Japan
TEL.03-3357-3800
FAX.03-3357-3801
Map
http://cnic.jp/english/
Email