DATE |
Operator |
Facility Name |
Type |
Short Description of Incidents |
Feb. 7 |
JNFL (Japan Nuclear Fuel Limited) |
Rokkasho Reprocessing Plant |
Reprocessing Plant |
Leak detected at fuel assembly transfer pit |
Feb. 12 |
Kansai-EPCO |
Takahama-1 |
Pressurized Water Reactor (PWR) |
During periodic inpection crack found at neutron
flux monitor nozzle (made of Inconel 600) mounted to reactor vessel bottom |
Feb. 18 |
Shikoku-EPCO |
Ikata-1 |
PWR |
Leak detected at chemical volume control tank outlet
piping |
Feb. 27 |
JAPC (Japan Atomic Power Company) |
Tsuruga-1 |
Boiling Water Reactor (BWR) |
Reactor manually shut down due to leak detected at
mechanical seals of recirculation
pumps (B and C) |
Feb. 27 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-3 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during planned stoppage |
Feb. 28 |
Tokyo-EPCO |
Fukushima I-3 |
BWR |
Control rod interlock cancelation found at 'one control rod draw check' during periodic inspection |
March 4 |
Tokyo-EPCO |
Fukushima I-3 |
BWR |
A control rod insertion delayed at 'control rod insertion/draw examination' during periodic inspection |
March 5 |
Tokyo-EPCO |
Fukushima II-1 |
BWR |
Foreign metal material found at the top of a nuclear
fuel assembly during periodic inspection |
March 10 |
Chubu-EPCO |
Hamaoka-3 |
BWR |
Cracks found at welds of core shroud (made of
SUS316L) middle and lower region during periodic inspection; cracks found at
inside surface of H4 position, at outside surface of H6a position, at inside
surface of H7 position, etc. |
March 27 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-4 |
BWR |
Cracks found at 6 welds of primary loop
recirculation system piping (made of SUS316L) during periodic inspection |
April 16 |
Tokyo-EPCO |
Fukushima II-1 |
BWR |
Cracks found at a weld between reactor pressure
vessel nozzle safe-end pipe (made of SUS316L) and primary loop recirculation
system piping (made of SUS304L) during periodic inspection |
April 17 |
Chubu-EPCO |
Hamaoka-3 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
April 17 |
Chubu-EPCO |
Hamaoka-4 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
April 29 |
Chugoku-EPCO |
Shimane-2 |
BWR |
Cracks found at welds of core shroud (made of
SUS316L) middle region during periodic inspection; cracks found at inside
surface of H4 position |
May 8 |
Kansai-EPCO |
Mihama-2 |
PWR |
Generator power reduced due to leak at 5th high
pressure feed water heater |
May 12 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-5 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
May 15 |
Kyushu-EPCO |
Sendai-1 |
PWR |
Damage to 15 steam generator tubes during periodic
inspection |
May 20 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-5 |
BWR |
Cracks found at welds of core shroud (made of
SUS316L) middle region during periodic inspection; cracks found at inside
surface of H4 position and of V14 position |
May 21 |
Kansai-EPCO |
Mihama-3 |
PWR |
Cracks found at reactor vessel bottom mounted
conduit tube during periodic inspection |
May 22 |
Kansai-EPCO |
Takahama-4 |
PWR |
Damage to 2 steam generator tubes during periodic
inspection |
May 26 |
Tohoku-EPCO |
Onagawa-3 |
BWR |
Reactor automatically shutdown due to 'large ground acceleration' signal set off by an earthquake (magnitude 7.0) |
May 28 |
Tokyo-EPCO |
Fukushima II-3 |
BWR |
Cracks found at guide roller installed area of a
control rod handle during periodic inspection |
June 9 |
Tohoku-EPCO |
Onagawa-2 |
BWR |
Cracks found at welds of core shroud (made of
SUS316L) middle region and lower region during periodic inspection; cracks
found at outside surface of H3 position and at inside surface of H7a position |
June 10 |
Chubu-EPCO |
Hamaoka-1 |
BWR |
Cracks found at a weld of core shroud (made of
SUS304) lower region during periodic inspection; cracks found at inside
surface of H7b position |
June 14 |
Tokyo-EPCO |
Fukushima II-3 |
BWR |
Fuel assemblies installation operation stopped due
to lack of a control rod at a fuel cell during periodic inspection |
June 16 |
Chubu-EPCO |
Hamaoka-1 |
BWR |
Cracks found at upper region of a weld of the core
shroud (made of SUS304) during periodic inspection; crack found near upper
lattice plate base |
June 23 |
Tohoku-EPCO |
Onagawa-2 |
BWR |
Cracks found at a weld of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
June 24 |
JAPC |
Tsuruga-1 |
BWR |
Cracks found at surface of control rod blades during
periodic inspection |
July 4 |
JNC (Japan Nuclear Cycle Development Institute) |
Fugen |
Advanced Thermal Reactor |
Fire alarm set off at waste treatment building;
window of low-level radioactive waste incinerator broken due to explosion and
460 million bequerels of radioactive ash leaked |
July 8 |
JNC |
Joyo |
Experimental Fast Reactor |
Reactor automatically shut down due to 'neutron flux high' signal |
July 15 |
Tokyo-EPCO |
Fukushima II-2 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
July 24 |
Tokyo-EPCO |
Fukushima I-2 |
BWR |
Leak found at instrumentation outlet of residue heat
removal system during periodic inspection |
July 29 |
Hokuriku-EPCO |
Shika-1 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during periodic inspection (also on Aug. 26 and on Sep. 3) |
July 31 |
Tokyo-EPCO |
Fukushima II-2 |
BWR |
Cracks found at welds of core shroud (made of
SUS316L) middle region during periodic inspaction; cracks found at outside
surface of H4 position |
Aug. 1 |
Tohoku-EPCO |
Onagawa-2 |
BWR |
Cracks found at welds of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
Sep. 7 |
Hokkaido-EPCO |
Tomari-2 |
PWR |
Leak found at regenerated heat exchanger; reactor
manually shut down for inspection on Sep. 11 |
Sep. 10 |
JAPC |
Tsuruga-2 |
PWR |
Build up of boric acid powder and cracks found at
welds of pressurizer relief valve nozzle and of pressurizer safety valve
nozzle during periodic inspection |
Oct. 6 |
Tohoku-EPCO |
Onagawa-2 |
BWR |
Leak detected at containment vessel sump; damage
found at mechanical seals of recirculation inlet pump and of recirculation
outlet pump during periodic inspection |
Oct. 6 |
Tokyo-EPCO |
Fukushima II-4 |
BWR |
Cracks found at guide roller installed area of
control rod handles and at surface of control rod blades during periodic
inspection |
Oct. 7 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-7 |
BWR |
Cracks found at impellers of reactor internal pumps
during periodic inspection |
Oct. 9 - Nov. 7 |
Tokyo-EPCO |
Fukushima I-1,2,3,4,6 |
BWR |
Various foreign materials (scaffolding members,
clamps, vinyl sheet chips, vinyl tape chips, ropes, spanner, pen, etc.) found
in suppression chambers during periodic inspection |
Oct. 14 |
Chugoku-EPCO |
Shimane-1 |
BWR |
Spacers slippage found at fuel assemblies during
periodic inspection |
Oct. 14 - Nov. 7 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-1,2,3,5,7 |
BWR |
Various foreign materials (vinyl sheet chips, ropes,
electromoved grinder, pliers, dust mask, video tape, boot, heat insulating
materials, etc.) found in suppression chambers during periodic inspection |
Oct. 16 - Nov. 7 |
Tokyo-EPCO |
Fukushima II-1,2,3,4 |
BWR |
Various foreign materials (vinyl sheet chips, vinyl
tape chips, ropes, spanner, pen, etc.) found in suppression chambers during
periodic inspection |
Oct. 17 |
Shikoku-EPCO |
Ikata-3 |
PWR |
Emergency diesel generator activation failed at
start-up operation |
Oct. 22 |
Kansai-EPCO |
Takahama-2 |
PWR |
Reactor manually shut down due to steam leak from
3rd low-pressure turbine inlet flange during conditioning operation |
Oct. 22 |
Tokyo-EPCO |
Fukushima II-4 |
BWR |
Crack found at weld of primary loop recirculation
system piping (made of SUS316L) during periodic inspection |
Nov. 5 |
Tokyo-EPCO |
Kashiwazaki-Kariwa-2 |
BWR |
One part of cleaning device fell into reactor vessel
during core shroud cleaning test operation during periodic inspection |
Nov. 6 |
Tohoku-EPCO |
Onagawa-2 |
BWR |
Various foreign materials (wire, vinyl sheet chips,
vinyl tape chips, ropes, miniature lamp, etc.) found in suppression chambers
during periodic inspection |
Nov. 9 |
Kansai-EPCO |
Mihama-2 |
PWR |
Reactor manually shut down due to primary coolant
leak found at cap of bent line attached to pressurizer spray piping |
Nov. 18 |
Tokyo-EPCO |
Fukushima I-6 |
BWR |
One part of cleaning device fell into reactor vessel
during control rod drive mechanism housing tub tube cleaning operation during
periodic inspection |
Nov. 19 |
Chubu-EPCO |
Hamaoka-2 |
BWR |
SCRAM signal set off accidentally due to ocsillation
in value indicated by average power range monitor |
Nov. 22 |
Chubu-EPCO |
Hamaoka-1 |
BWR |
One part of cleaning device fell into reactor vessel
during core shroud support cylinder cleaning operation during periodic
inspection |
Nov. 25 |
Chubu-EPCO |
Hamaoka-1 |
BWR |
Cracks found at welds of core shroud support
cylinder and of core shroud support legs during periodic inspection |
Dec. 2 |
Chugoku-EPCO |
Shimane-1 |
BWR |
A worker exposed due to inhalation of 917 bequerels
of cobalt-60 during containment vessel head installation operation |
Dec. 5 |
Kansai-EPCO |
Ohi-1 |
PWR |
Reactor manually shut down due to leak from
mechanical seal of primary coolant pump |
Dec. 5 |
Tokyo-EPCO |
Fukushima I-6 |
BWR |
Leak found at water level gauge tube opening during
periodic inspection |
Dec. 18 |
Chubu-EPCO |
Hamaoka-1 |
BWR |
Cracks found at welds of jet pumps during periodic
inspection |
Dec. 19 |
JAPC |
Tsuruga-1 |
BWR |
Reactor automatically shut down due to lightning |
Dec. 20 |
Tokyo-EPCO |
Fukushima I-6 |
BWR |
Stress reduction device stopped during operation
to reduce stress on control rod drive
mechanism housing stub tubes during periodic inspection |
Dec. 26 |
JAPC |
Tsuruga-1 |
BWR |
Leak detected at mechanical seal of recirculation pump; reactor manually shut
down on Dec. 28 |